The FC-75 industrial food waste grinder should be placed on a level, stable surface in a temperature-controlled area. It requires a standard power outlet, enough ventilation for heat and airflow, and the included drain hose must be able to reach a nearby drainage point such as a floor drain, wall drain, or utility sink.
No hard plumbing installation is needed beyond attaching the drain hose and placing it into a proper drain.